Monday, October 7, 2013

Perfect timing!

        Harvesting takes top priority right now, but Thursday was perfect timing.  Since weatherman forecast included stormy weather and I happened to have the afternoon off, we called my dad to plan a tiling party.  The rain happened to roll in just as I was getting off work.
        We finished the first half at around 10 o'clock that night.  Then Friday while it was still wet and I was at work, my husband finished three more rows.  Now it would be possible to move the fridge up on the tiles to complete the rest of the kitchen.  Saturday my husband and I grouted what we had finished. 
       The weather happened to work out perfectly for us one more time.  Sunday it was cloudy and misty all day while we were visiting my grandma, which meant this morning worked out wonderfully to finish laying them.  They were just about finished when I headed off to work at noon.
        Now, all that's left to do is seal it and paint the front of the heater cover.  They are forecasting rain again this weekend. Maybe we will get base cabinets put in then.


Thursday, September 26, 2013

Fly Away!

         Tomorrow is my last day in Pre-K. Wow,those six weeks sure went fast! It's going to be hard saying good-bye to all the preschoolers, but it will be nice to get caught up on some things at home. 
        Here is the quilt I made for baby Jase. I hope it gets lots of use and I will be praying for his momma. It's going to be hard to leave him at home and return to school. 
      For the backing I pieced together all the colors I used on the front.

Monday, September 23, 2013

Progress

        Over the past month we have made good progress on our kitchen remodel.  First, we built new soffits to accommodate our cabinets.  Then my husband and his good friend mudded the kitchen in the evenings.  It was a long process due to the fact we had to mud over the rough plaster in the dining room to make the kitchen match.  Also, for some reason the mud kept leaving air bubble holes even though they cleaned the walls several times.  Once they finished, I painted the walls.  The white places are where cabinets will eventually go so I saved on paint by skipping them. 
        This corner used to be empty.  I'm so excited to have cabinets here.  In the end the upper cabinets will house baking dishes and the base cabinets will house small appliances/canning supplies. There will be molding around the upper cabinets to finish them off.
        We also put up the cabinets above the stove.  Our new kitchen will have an oven hood too, which was just wired this weekend.  You might notice the stove is a little larger than the hood.  We do have a new stove sitting in the living room, but we are waiting to put it in until we are done with all the mudding.  Drywall dust is so fine I don't want to destroy it already.  (Happy Birthday to me!!)
 
       After finishing the paint job, I started painting around the windows.  It's taking more coats than I thought, which is why the upper cabinets are missing on both sides.  You might remember from earlier pictures the sink was not torn out like the rest in April. Since we are preparing to put in the new flooring, we took it out last Sunday. 
       Under the window you might notice some gray places.  The water had leaked behind the sink for so long it destroyed the plaster.  We are currently working on fixing it. 
        On Friday school had an early dismissal for an SIP day, since I'm just a substitute I didn't have to stay.  Luckily my dad was able to come over to help us lay the concrete board down.  Now we just need a free day to lay tile.  Meanwhile harvest is starting so it might be a long while until there is another update.

 
 

 

Monday, August 19, 2013

New Beginnings!

        Today I start my new adventure as a preschool teacher for 6 weeks.  For me it's uncharacteristic to not have spend hours planning and preparing for the first day of school, but I guess that is what happens when you take over for a maternity leave.  Can't wait to meet all my students tonight at Open House!!
       Congratulations to Mr. & Mrs. Andrews and their baby boy 2 1/2 weeks early:)

Thursday, July 11, 2013

Summer Fun

        Some people visit the pool when the temperatures start rising...not me.  I started painting things around the farm. 
 
       First on the list was these diesel fuel barrels my sister-in-law painted years ago. Too bad the cow was badly rusting, he was kind of cute.  On a positive note, the shade tree would provide some protection from the heat. 
       
        Every evening while I was painting these, an elderly neighbor stopped by on his daily drive to town for dinner. During our chats he said he was sad to hear I wouldn't be painting the cow back. 
        As you can see, though, my painting skills are very limited.  They look pretty good with a fresh coat of paint.  Just don't look too close.  
        Next up was the fence behind the fuel barrels.  Last year my husband rebuilt the fence using treated lumber.  They say you are supposed to let it weather for a year before you paint it which meant it was time to paint them.
       Now that I'm done with that we can put cows in the front pasture to eat down all the tall grass. 
       

         
 

 


Sunday, July 7, 2013

Gift of Finest Wheat

        Today we harvested the last wheat field for 2013.  This 26 acre field was our only wheat field, but my husband has been harvesting for the neighbors this past week.  Theirs brought anywhere from 45 to 70 bushels per acre.  We will have to wait until Monday when the elevator opens to see how ours did.  Now hopefully we can enjoy the rest of the day and do something nice for our anniversary.
       "You satisfy the hungry heart with gift of finest wheat, come give to us o saving Lord, the bread of life to eat."
         "As when the shepherd calls his sheep, they know and heed his voice; so when You call your family Lord, we follow and rejoice."
        "With joyful lips we sing to You, our praise and gratitude, that You should count us worthy Lord, to share this heavenly food."
         "The mystery of your presence Lord, no mortal tongue can tell; whom all the world cannot contain comes in our hearts to dwell."
         "You give yourself to us o Lord, then selfless let us be, to serve each other in Your name in truth and charity."
       As we celebrate our first anniversary today, may we always remember God's blessings in our lives and thank him for the wonderful gifts he has given us.

Monday, July 1, 2013

100th Anniversary

        Back in 1913 the Keokuk Dam and Power Plant was complete.  It was the first of its kind to span the Mississippi River.  If you follow the dam, power plant, and lock system, it spans 2 1/2 miles.  The first part of our tour was riding a trolley across the dam. The dam complete with 119 spillways is to the right of the power plant. 
          They borrowed two trolley's from Western Illinois Threshers to give visitors a ride.  The last time anyone had this opportunity was back in 1993 when the flood prevented people from driving across the Keokuk-Hamilton bridge.  They brought in a trolley then to give workers a safe way to get to work for over three weeks. 

        My nephew had the best time looking at all the water.
        The cranes, which are hard to see in the photo, have gathered to catch all the fish that make it threw the dam.  We were able to see one catch a fish.  All the other birds gathered around to steal his catch.  It took him awhile to swallow the fish whole, but he was able to keep it to himself.  
         Now you can see the water spilling out of the dam spillway.  The upper river elevation is maintained at a constant elevation while the lower river level varies with water flow. The average difference is 35 feet. Each spillway can pass 30,000 gallons of water per second.
        The Mississippi River is above flood levels for the third time this summer, but the only time all the dam spillways were open was back in the flood of 1993.  Can you imagine how much water was flowing then. 
        Here you can see the other trolley going across the dam.  It is going under the mounted system they use to lower and raise the spillway gates. 

       They brought one of the gates inside the power plant for us to see the size of them.  It's 32 feet long and 11 feet high and weighs 14 tons.
 
               Next on our tour was a walking tour of the plant. First, we walked past the old lock system, which was only able to hold one barge at a time. The dry lock is where they could put barges to work on them.  They would float them in and then drain all the water out.  
         Now you can see the workers house between the lock and dry lock. 
         The lock had two gates.  One on the upper side and one on the lower side.  When a barge came from the upper Mississippi, they would open the upper gate, allow the barge in, close it, let the water out, and open the lower gate to let the barge out.  
 Water first comes into the plant on the left side.  
       Water enters under the outside skimmer wall through arches in the foundation. This design blocks floating debris from entering the Turbine Intake Area.  Once inside water passes through trash screens, which keeps logs from reaching turbines.
Water enters a concrete passageway, goes through the turbines, and out the east wall.
        This gate is lifted allowing the water to flow in.   There are four gates for each turbine. Each gate is 40 feet tall and weighs 5 tons. 
       This is one of the old transformer located in the plant.  Generated power is increased from 13,800 volts to 69,000 volts by these transformers for transmission to substations in Illinois and Iowa.
        Here is a newer transformer.  Wow, those are huge!  The plant had two old transformers and three or four newer transformers. 
Here is a look at the east side of the plant. 
        There are fifteen generators.  Water spins each turbine at 62.1 RPM. Each 10,000 horsepower turbine is connected with a generator like this one to produce 10,000kW of electricity. 
     What a great way to spend a cool Sunday afternoon!